Schedule

Overall Project Construction Progress

Percent Complete
5%

Pre-Stage
(November to early December 2026)

  • Setup traffic control
  • Install erosion and sediment control measures
  • Install the temporary traffic signal at the intersection of Washington Street & IL 21 and remove the existing signal equipment
  • Remove the existing concrete medians (as needed) and replace with temporary pavement
  • Begin storm sewer installation using daily lane closures

Winter Shutdown
(December 2026 through April 2027 weather dependent)

  • No work

Stage 1
(May and June 2027)

  • Place temporary pavement markings and shift traffic into the middle of Washington Street and IL 21 to construct the widening from the outside lane
  • Remove the existing curb & gutter, excavate and install new storm sewer for the widening
  • Place concrete for new curb & gutter, pavement widening and patching
  • Install new foundations and underground conduits for the traffic signal at Washington Street & IL 21
  • Replace the sidewalk at the intersection of Washington Street & IL 21 to be ADA compliant and re-pave the shared-use path along Washington Street

Stage 2
(June and July 2027)

  • Place temporary pavement marking and shift traffic into the outside lanes of Washington Street while IL 21 is mostly unchanged
  • Remove the existing concrete medians, install new storm sewer and place concrete for new medians and pavement patching in the middle of Washington Street

Final
(August 2027)

  • Diamond grind to smooth out the existing concrete pavement
  • Mill and resurface the asphalt pavement at the project limits where it connects to the concrete pavement
  • Place new pavement markings and signage
  • Restore landscaping
  • Install and turn on the new traffic signal

Project Milestone

  • Lorem ipsum dolor sit amet, et dolore magna aliqua.
    • Ut enim ad minim veniam, quis nostrud exercitation
    • Ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. 
    • Scheduled X/X/XX
  • Sed ut perspiciatis unde omnis iste natus error sit voluptatem accusantium doloremque laudantium, totam rem aperiam, eaque ipsa quae ab illo inventore veritatis et quasi architecto beatae vitae dicta sunt explicabo.

Project Milestone

  • Lorem ipsum dolor sit amet, et dolore magna aliqua.
    • Ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. 
    • Scheduled X/X/XX

Project Milestone

  • Lorem ipsum dolor sit amet, et dolore magna aliqua.
  • Sed ut perspiciatis unde omnis iste natus error sit voluptatem accusantium doloremque laudantium, totam rem aperiam, eaque ipsa quae ab illo inventore veritatis et quasi architecto beatae vitae dicta sunt explicabo.
    • Ut enim ad minim veniam, quis nostrud exercitation
    • Et harum quidem rerum facilis est et expedita distinctio
    • Ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. 
    • Scheduled X/X/XX
  • Sed ut perspiciatis unde omnis iste natus error sit voluptatem accusantium doloremque laudantium, totam rem aperiam, eaque ipsa quae ab illo inventore veritatis et quasi architecto beatae vitae dicta sunt explicabo.